RNB000270R - Shock Absorber – Front – Air Suspension
Original price
-
Original price
€39,40
Original price
€39,40
€39,40
-
€39,40
Current price
€39,40
Aftermarket: Quality alternative.
This is a quality alternative, designed to fit and function like the original part, often at a more competitive price.
Front Shock Absorber - part of the front suspension damping assembly.
The damper is mounted between the front axle and its chassis bracket and works with the front road spring to control axle oscillation, keeping the tyre loaded and the body settled over uneven ground. A worn unit typically shows as float or wallow after a bump, nose dive under braking and uneven tyre wear.
This is the damper specification listed for chassis built with air suspension; vehicles on conventional coil-sprung suspension or with Active Cornering Enhancement (ACE) take a different damper. Dampers are fitted one per side and should be renewed as an axle pair so damping stays balanced left to right.
The damper is mounted between the front axle and its chassis bracket and works with the front road spring to control axle oscillation, keeping the tyre loaded and the body settled over uneven ground. A worn unit typically shows as float or wallow after a bump, nose dive under braking and uneven tyre wear.
This is the damper specification listed for chassis built with air suspension; vehicles on conventional coil-sprung suspension or with Active Cornering Enhancement (ACE) take a different damper. Dampers are fitted one per side and should be renewed as an axle pair so damping stays balanced left to right.
Vehicle Model
Land Rover Discovery 2 1998-2004 (L318)
Fitment Notes
DISCOVERY 2 1998-2004 — Front shock absorber (damper front), with air suspension. Fits from VIN (V)3A000000 onwards. Qty 2 per vehicle.
Alternative Codes
RNB000270RRNB000270
Available to order
2–3 weeks
Not currently in stock. Order now — typically ships within 2–3 weeks.
Need it faster? Contact us about express import (2–5 business days).
When will my order arrive?
This item is ordered from our supplier on request. Typical lead time is 2–3 weeks from order confirmation.
- Netherlands / Belgium / Germany: 2–4 working days after dispatch.
- Other EU countries + UK: 4–8 working days after dispatch.
- Outside EU/UK: contact us for an estimate.
Need it faster? Express import available in 2–5 business days — contact us before ordering.