LR132754W - Air Suspension Strut – Front – LH
Original price
-
Original price
€400,00
Original price
€400,00
€400,00
-
€400,00
Current price
€400,00
OEM: Made by an Original Equipment Manufacturer.
This part is made by an original equipment manufacturer or under their license, ensuring compatibility and quality.
Brand
BWI
Front Air Suspension Strut, Left-Hand Side - front axle assembly of vehicles built with four corner air suspension.
The strut combines the air spring and the hydraulic damper in one unit, located between the front suspension arm and the body turret. The air spring carries the corner load and sets ride height; the integral damper controls wheel and body movement. Pressure is regulated by the air suspension control module through the compressor and valve block, referenced to the ride height sensor on the same corner, so a failed strut usually presents as a corner that settles overnight together with a stored height-control fault.
Supplied singly for the left-hand side. The matching right-hand strut is LR132751.
The strut combines the air spring and the hydraulic damper in one unit, located between the front suspension arm and the body turret. The air spring carries the corner load and sets ride height; the integral damper controls wheel and body movement. Pressure is regulated by the air suspension control module through the compressor and valve block, referenced to the ride height sensor on the same corner, so a failed strut usually presents as a corner that settles overnight together with a stored height-control fault.
Supplied singly for the left-hand side. The matching right-hand strut is LR132751.
Vehicle Model
Land Rover Defender New 2020+
Fitment Notes
NEW DEFENDER 2020 ON (L663) — Front air suspension strut / shock absorber, LH. With Four Corner Air Suspension. Fits 110.
Alternative Codes
LR132754WLR132754
Available to order
2–3 weeks
Not currently in stock. Order now — typically ships within 2–3 weeks.
Need it faster? Contact us about express import (2–5 business days).
When will my order arrive?
This item is ordered from our supplier on request. Typical lead time is 2–3 weeks from order confirmation.
- Netherlands / Belgium / Germany: 2–4 working days after dispatch.
- Other EU countries + UK: 4–8 working days after dispatch.
- Outside EU/UK: contact us for an estimate.
Need it faster? Express import available in 2–5 business days — contact us before ordering.