RTC4484GIRLING - Shock Absorber – Oil-Filled – Front
Original price
-
Original price
€55,00
Original price
€55,00
€55,00
-
€55,00
Current price
€55,00
OEM: Made by an Original Equipment Manufacturer.
This part is made by an original equipment manufacturer or under their license, ensuring compatibility and quality.
Brand
Girling
Shock Absorber for the front suspension - an oil-filled, heavy-duty hydraulic damper.
Mounted between the axle and the chassis, it damps the oscillation of the road spring and controls wheel movement over uneven surfaces, limiting body roll and helping maintain tyre contact with the road. The hydraulic action is produced by forcing oil through internal valving as the unit extends and compresses. This is the heavy-duty oil-filled specification, suited to harder use and heavier loads.
Mounted between the axle and the chassis, it damps the oscillation of the road spring and controls wheel movement over uneven surfaces, limiting body roll and helping maintain tyre contact with the road. The hydraulic action is produced by forcing oil through internal valving as the unit extends and compresses. This is the heavy-duty oil-filled specification, suited to harder use and heavier loads.
Vehicle Model
Land Rover Defender up to 2016
Land Rover Series 1
Land Rover Series 2 and 3
Land Rover Series 1
Land Rover Series 2 and 3
Fitment Notes
Fitment data limited — derived from web research, verify if uncertain
SERIES IIA/III 1963-1986 — 109in LWB, front position, heavy-duty oil-filled (also fits 107in LWB)
DEFENDER 110 — front, heavy-duty oil-filled
SERIES IIA/III 1963-1986 — 109in LWB, front position, heavy-duty oil-filled (also fits 107in LWB)
DEFENDER 110 — front, heavy-duty oil-filled
Alternative Codes
RTC4484GIRLINGRTC448450243290508033GDA1020GSA196RTC4483SEE500140
Available to order
2–3 weeks
Not currently in stock. Order now — typically ships within 2–3 weeks.
Need it faster? Contact us about express import (2–5 business days).
When will my order arrive?
This item is ordered from our supplier on request. Typical lead time is 2–3 weeks from order confirmation.
- Netherlands / Belgium / Germany: 2–4 working days after dispatch.
- Other EU countries + UK: 4–8 working days after dispatch.
- Outside EU/UK: contact us for an estimate.
Need it faster? Express import available in 2–5 business days — contact us before ordering.