Doorgaan naar inhoud
8–23 August: reduced summer staffing. Orders may take up to 5 extra working days to dispatch and emails up to 2 working days to answer. Thanks for your patience.
8–23 Aug: orders may ship up to 5 days later.

RTC6621 - Condensor – Lange draad – 17-7/8

Oorspronkelijke prijs - Oorspronkelijke prijs €2,00
Oorspronkelijke prijs
€2,00
€2,00 - €2,00
Huidige prijs €2,00
Tip: Log in to your account to unlock volume discounts on this item.
Aftermarket Part
Aftermarket: Quality alternative. This is a quality alternative, designed to fit and function like the original part, often at a more competitive price.
Ontstekingscondensator voor de onderbrekerverdeler, van het Lucas-type, geleverd met een lange kabel (45,4 cm).

De condensator, die parallel is aangesloten op de contactpunten van de onderbreker, absorbeert de stroomstoot wanneer de punten openen, waardoor vonkoverslag wordt onderdrukt om de contacten te beschermen tegen inbranden en om een schone, sterke vonk bij de bougies te produceren. De verlengde kabel is geschikt voor verdelers met een extern gemonteerde condensator.
Vehicle Model Land Rover Defender t/m 2016
Land Rover Series 2 en 3
Fitment Notes DEFENDER — 2.25L en 2.5L benzine, met Lucas verdeler
SERIES II/III — 2.25L en 2.5L benzine, met Lucas verdeler
Alternative Codes
RTC6621BE 3599GSC118GSC2118RTC3471RTC3474

In stock 75 units
60 · Gouda 15 · Drachten
Express delivery available

When will my order arrive?
  • Order before 15:00 (Mon–Fri): same-day dispatch for in-stock items.
  • UPS Express (order before 14:00): dispatched today, delivered tomorrow where available.
  • Netherlands / Belgium / Germany: 2–4 working days.
  • Other EU countries + UK: 4–8 working days.
  • Outside EU/UK: delivery times vary — contact us for an estimate.

Items may ship from multiple warehouses at no extra cost.

Job kits containing this part

This part is included in 0 job kit(s) below. Pick the kit that matches your vehicle and job, then add what you need.

Frequently asked questions

What is the RTC6621 long-lead condenser for?
The RTC6621 is an ignition condenser with a long 17-7/8 inch lead, for Lucas-type contact-breaker distributors. It fits across the points to soak up the current surge as they open, preventing arcing and giving a clean spark. Suits Series 2/3 and Defender 2.25L and 2.5L petrol engines with a Lucas distributor.
Why does this condenser have a long lead?
The long 17-7/8 inch lead suits distributors where the condenser mounts externally rather than inside the distributor body. It gives enough reach to connect from an outside mounting point to the points terminal. If your condenser sits inside the distributor, you'll typically want the shorter standard lead instead.
Which distributor does the RTC6621 fit?
The RTC6621 fits Lucas-pattern distributors on Series 2, Series 3 and Defender 2.25L and 2.5L petrol engines. It won't match a Ducellier distributor, which uses a different condenser. Check your distributor maker's marking before ordering to make sure you get the right one.